Case Studies

Real jobs, real streets, real certificates.

No stock photography, no generic case studies. Every project below is a completed job — a Sheffield address, a real fault or brief, and the certified work that fixed it.

Future Electrical Solutions has completed hundreds of jobs across Sheffield and the surrounding towns — from small domestic repairs to full commercial fit-outs and MCS-certified solar installs. Below are six recent projects, each covering a different service, told the way they actually happened: what the customer called us about, what we found, what we did, and how it was left.

Domestic electrical rewire completed in Nether Edge, Sheffield

Nether Edge, Sheffield

Full House Rewire

Domestic Electrical

A 1930s semi with wiring nobody could certify.

The problem: the owners of a three-bed semi in Nether Edge were selling and had an EICR come back with multiple C1 and C2 faults — old rubber-sheathed cabling, no RCD protection, and a fusebox that hadn't been touched since the 1970s.

The work: a complete rewire over five days, new consumer unit with full RCD/RCBO protection, and every circuit brought up to current standard, chased and made good before the next trade went in.

The outcome: a clean EICR, full BS 7671 certification, and a sale that went through without the buyer's solicitor raising a single query.

5-Day RewireNew Consumer UnitFull BS 7671 Certification

Commercial electrical fit-out completed in Kelham Island, Sheffield

Kelham Island, Sheffield

Office & Workshop Fit-Out

Commercial Electrical

A shell unit, wired for a design studio and workshop in one.

The problem: a growing design and fabrication business took on a bare shell unit in Kelham Island and needed three-phase power to the workshop floor alongside standard office circuits, data cabling and emergency lighting — on a tight fit-out deadline.

The work: full first and second fix across both zones, three-phase distribution board for workshop machinery, dedicated ring mains for the office, and emergency/exit lighting to meet fire regulations.

The outcome: signed off and certified two days ahead of the fit-out deadline, with EICR and full documentation handed over for the landlord's records.

Three-Phase PowerEmergency LightingEICR Included

Solar PV and battery storage installation completed in Hillsborough, Sheffield

Hillsborough, Sheffield

Solar PV & Battery Install

Solar PV & Battery Storage

A south-facing roof, finally put to work.

The problem: a family in Hillsborough had a large, unshaded south-facing roof and rising electricity bills, but wanted to know exactly what they'd generate and save before committing.

The work: a full MCS-certified survey and design, followed by installation of a 4.2kW panel array with an integrated battery storage system sized to cover typical evening usage.

The outcome: the household now covers the majority of daytime usage from solar generation, with the battery carrying them through most evenings — plus export payments for anything unused.

MCS Certified4.2kW ArrayBattery Storage

EV charge point installed on a driveway in Crookes, Sheffield

Crookes, Sheffield

Driveway EV Charge Point

EV Charging

New EV, old consumer unit — sorted in a day.

The problem: a Crookes homeowner had just taken delivery of an electric vehicle and needed a home charge point, but their existing consumer unit had no spare capacity for a new dedicated circuit.

The work: consumer unit assessment and a small upgrade to free up capacity, followed by installation of an OZEV-compliant smart charger on the driveway with tariff-aware scheduling set up on handover.

The outcome: charging overnight on the cheapest tariff window, installed and certified in a single visit.

OZEV CompliantSmart ChargingSingle-Day Install

Fire alarm system upgrade completed in Broomhill, Sheffield

Broomhill, Sheffield

Fire Alarm Upgrade

Fire

An HMO landlord, one step ahead of the inspection.

The problem: a landlord with a licensed HMO in Broomhill had an ageing, standalone smoke detector setup that no longer met current fire safety requirements for a house of multiple occupation.

The work: design and installation of a fully interlinked mains-powered fire detection system across all floors and communal areas, with heat detectors in kitchens and a certified test-and-commission handover.

The outcome: passed the council's HMO inspection first time, with full documentation ready for the licence renewal.

Interlinked SystemHMO CompliantCertified Handover

CCTV and security system installed in Meersbrook, Sheffield

Meersbrook, Sheffield

CCTV & Security Install

Security

After a spate of shed break-ins on the street.

The problem: following a run of shed and garden break-ins in a Meersbrook street, a homeowner wanted proper coverage of the property's exterior and a monitored alarm — not a bolt-on doorbell camera.

The work: a four-camera CCTV system covering all approaches and the garden, integrated with a wired intruder alarm and remote app access, run and terminated neatly with no visible external cabling.

The outcome: full remote monitoring from day one, and the wider street since asked us to quote three more properties.

4-Camera CCTVIntruder AlarmRemote App Access

Want a job like these done properly?

Book a free site survey and we’ll scope it the same way — properly, and on the record.